• Medientyp: E-Artikel
  • Titel: CO2 capture RD&D proceedings in China Huaneng Group
  • Beteiligte: Wang, Jinyi; Xu, Shisen
  • Erschienen: Springer Science and Business Media LLC, 2014
  • Erschienen in: International Journal of Coal Science & Technology
  • Sprache: Englisch
  • DOI: 10.1007/s40789-014-0013-6
  • ISSN: 2095-8293; 2198-7823
  • Schlagwörter: Energy Engineering and Power Technology ; Geotechnical Engineering and Engineering Geology
  • Entstehung:
  • Anmerkungen:
  • Beschreibung: <jats:title>Abstract</jats:title><jats:p>CO<jats:sub>2</jats:sub> capture is an important carbon management route to mitigate the greenhouse gas emission in power sector. In recent years, China Huaneng Group (CHNG) has paid more attention on CO<jats:sub>2</jats:sub> capture technology development and launched a series of R&amp;D and demonstration projects. In the area of pre-combustion CO<jats:sub>2</jats:sub> capture technology, GreenGen project initiated by CHNG is the first integrated gasification combined cycle (IGCC) power plant in China. Located in Tianjin, GreenGen aims at the development, demonstration and promotion of a near-zero emissions power plant. An IGCC plant of 250 MW has successfully passed full-scale trial operation. In the next phase, a pre-combustion CO<jats:sub>2</jats:sub> capture unit will be integrated into the system. Pre-combustion process based on coal chemical process has been developed with lower costs successfully. Regarding to post-combustion CO<jats:sub>2</jats:sub> capture (PCC), in 2008, CHNG built a 3,000 tpa CO<jats:sub>2</jats:sub> capture plant, which was the first CO<jats:sub>2</jats:sub> capture demonstration plant in China. In 2009, CHNG launched a PCC project in Shanghai with a capture capacity of 120,000 tpa CO<jats:sub>2</jats:sub>. Recently, Huaneng Clean Energy Research Institute (CERI) and Powerspan formed a joint venture, Huaneng-CERI-Powerspan (HCP). HCP has completed the technology qualification program to supply carbon capture technology for the CO<jats:sub>2</jats:sub> capture Mongstad project. Besides these activities mentioned above, feasibility studies and system design for large scale PCC system, have been undertaken by CERI and its partners from Australia, US and Europe.</jats:p>
  • Zugangsstatus: Freier Zugang